Archive for January, 2011

Brass hole

Monday, January 10th, 2011

While installing the cupboard latches for the built-ins, I have so far snapped off three screw heads. The first two times were during the dry assembly, before everything was painted or in place, so it wasn’t a big ordeal. This most recent time, however, was after the face frame had been secured in place. Luckily, the experience from the first two times made it easier to come up with a strategy…


(more…)

Trimming down

Sunday, January 9th, 2011

Between the holidays and a top-secret project (more on that soon), it’s been a while since I’ve had any reportable progress. But with the new year, it’s time for progress… and a new post! I’ve spent the past couple of weeks doing more work on the built-ins and trim, and it’s starting to make quite a difference.

The first order of business was assembling the face frame for the built-in cabinets under the window. Since the spacing and sizing of the cabinets was determined by the spacing of the existing studs, all of this had to be built to fit.


(more…)